- Disassembly and reassembly of pipes and pumps
- dismantling of PVC pipes and fittings
- Delivery and assembly of valves, pumps and pipelines
- Dispose of and deliver filter material
- Disassembly and reassembly of approx. 40 m of pipes and 22 pumps with fittings
- Dismantling and disposal of approx. 600 m of PVC pipe and approx. 80 fittings
- Delivery and installation of approximately 90 fittings, 2 pumps, 3 heat exchangers, 6 flow measurements, 4 magnetic vetils and approx. 600 m of HDPE, hard PVC and PVC-C pipes
- Dispose of approx. 77 m³ of filter material and deliver new
- All measures are carried out under full operation of the processing plants with short interruptions for the production of provisional solutions and for rearrangement work
- The work is carried out in several stages, continuous work is not possible.