Sanitary installation K1
Construction of a new drinking water network in stainless steel (approx. 1000 running metres) and the drainage pipes (approx. 300 running metres) for the K1 part of the BV including distributions, backwash filters and hygienic flushes. 7 universal basins and 10 instantaneous water heaters are to be installed on objects. The pipe insulation must also be carried out. There are about 35 installation walls to be installed.