Wall-covering and wall-papering work | Tenderlake

Wall-covering and wall-papering work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 July 2020
Closing Date:
07 September 2020
Location(s):
DED5 Leipzig (DE Germany/DEUTSCHLAND)
Description:
Lot 16 - painting work new 7.3

Lot 16: painting.

Gross amounts:

- 141.00 m 2nd Install interior plaster wall Q2 including spraying and surface treatment;

- 735.00 m 2nd Install interior plaster reveal Q3 including underground treatment;

- 84.00 m 2nd Interior plaster wall on insulation with reinforcement plaster u. Fabric insert;

- 18.00 m 2nd Interior plaster ceiling on insulation with reinforcement plaster u. Fabric insert;

- 8 873.00 m 2nd Wall inside plaster. fill from Q2 to Q3;

- 6 768.00 m 2nd Filling the walls and pillars inside concrete Q3;

- 1 156.00 m 2nd Reveal inside concrete Q3;

- 15,950.00 m 2nd Wall pad cellulose-polyester fleece 160 g / m 2nd ;

- 1,891.00 m 2nd Reveal underlay cellulose polyester fleece 160 g / m 2nd ;

- 10,495.00 m 2nd Erstbesch Wall Dispersion, GBS-Intermediate. Final Coating, white;

- 905.00 m first coating dispersion, GBS- intermediate. Final coating, white;

- 3 902.00 m 2nd Erstbesch wall dispersion, GBS top coat, white;

- 53.00 m first coating dispersion, GBS top coating, white;

- 6,306.00 m 2nd Erstbesch Wand Acrylatdispersion-GBS, intermediate top coat (SB1 + SB2);

- 987.00 m first coating of acrylic dispersion GBS, intermediate top coat (SB1 + SB2);

- 4,447.00 m 2nd Filling the inside of the concrete ceiling Q3;

- 690.00 m 2nd Inside gypsum fiber pl. fill from Q2 to Q3;

- 701.00 m 2nd Base cellulose polyester fleece 160 g / m 2nd Ceiling;

- 5,581.00 m 2nd First coat, dispersion NAK 2, GBS, intermediate and final coating;

- 264.00 St. Haft -GBS on steel doors and frames with existing works. Coating;

- 264.00 pcs. Acrylic resin paint on steel doors and frames;

- 182.00 m 2nd Coating stair railing steel primed with alkyd resin paint, intermediate and final coating;

- produce 22 089.00 m of acrylic joint;

- 130.00 m 2nd System wall coating 2K-EP, clean room, including substrate preparation;

- 53.00 m 2nd System floor coating 2K-EP, clean room, including substrate preparation;

- 34.00 m 2nd Floor coating system 2K-EP, WHG 1, including substrate preparation;

- 18.00 m 2nd System floor coating 2K-EP, WHG 2-conductive, including substrate preparation;

- 48.00 m 2nd System floor coating 2K-EP R9-medium mech. Charge;

- 18.00 m 2nd System floor coating R9, 2K-EP, highly chemical and disinfectant-resistant, high mechanical load;

- 62.00 m 2nd Flooring resistant to oil and diesel, dust-binding, R9.1 K acrylic dispersion;

- 64.00 m 2nd Oil-resistant paint on elevator underpasses;

- 1,476.00 m 2nd Soil sealing 2K-EP including substrate preparation and priming;

- 1 131.00 m sealing base 2K-EP including substrate preparation and primer.

Download full details as .pdf
The Buyer:
Helmholtz-Zentrum für Umweltforschung GmbH – UFZ, Abteilung Einkauf
CPV Code(s):
45432200 - Wall-covering and wall-papering work