Geothermie Holzkirchen GmbH has built a geothermal power plant with an electrical output of approx.3.4 MWel at the Holzkirchen location, has been supplying the location with district heating since December 2018 and has been feeding electricity since 2019.
The tender 5.3.2 Asphalt and paving work includes the construction of the following components:
Lot 5.3.2.1, asphalt work
- 585 m
Lot 5.3.2.2 paving:
- 50 running meters of plastic pipes;
- 90 m box gutters;
- 450 m of lowboard;
- 2,350 m
The substructure is already available on site. Based on the current condition, the contractor must erect the finished asphalt or paving surfaces.
Asphalt worksLot 5.3.2.1, asphalt work, 585 m
Lot 5.3.2.2, paving:
- 50 running meters of plastic pipes;
- 90 m box gutters;
- 450 m of lowboard;
- 2,350 m