The client, the city of Bergen, is planning the construction of a new specialist class building for the Regional School Am Rugard.
LOT 12.2 FLOORING WORK FLOORING WORK SPECIALIST CLASS BUILDING Preliminary work Cleaning the substrate from coarse dirt, new screed, for PVC planks 1,600,000 m² Clean substrate from coarse dirt, new screed, for painting 88,000 m² Residual moisture measurement 20,000 pcs Cut edge insulation strips 1,300,000 m Epoxy coating as moisture barrier 200,000 m² adhesive primer; rough and grippy 1,688,000 m² Spatula Compensate substrate with levelling spatula, new screed 1,659,000 m² Allowance Spatula of steps 39,000 m² Multithickness putty 200,000 m² Compensate substrate on vertical steps with stable leveling putty 29,000 m² flooring Flooring, PVC planks (wear layer thickness 0.7 mm) 1,260,000 m² Allowance for PVC plank installation in herringbone pattern 160,000 m² Allowance for PVC flooring as installation on steps and steps 60,000 m² floor covering, PVC planks (wear layer thickness 0.55 mm) 340,000 m² angle rail on stair bolsters / step and setting step 43,000 running meters Stair edge profile for step edge 126,720 running meters Skirting PVC 1.080,000 lfm Skirtboard Wall connection stairs steps 42,000 running meters Dividing rail between different floor coverings 16,000 running meters Expansion profile 193,000 m Work Clean-running mat 4,000 pcs Floor coating fillet profile 50*70 mm 80,000 m Coating of floors in HA rooms, 94,000 m² FLOOR COATING WORKSHOP Clean substrate from coarse dirt, new screed, for painting 43,000 m² Residual moisture measurement 1,000 psch Cut off edge insulation strips 26,000 m Epoxy coating as moisture barrier 43,000 m² adhesive primer; rough and grippy 43,000 m² of ground levelling with levelling filler, new screed 43,000 m² expansion profile at the gate 2,100 m fillet profile 50*70 mm 26,000 m Coating of floors in workshop 49,000 m² hourly wage work Hourly wage work, foreman 1,000 h hourly wage work, skilled worker 1,000 h hourly wage work, helper 1,000 h