Demolition work, shell construction work: Building part house C1 / ground floor is gutted. Demolitions of non-load-bearing masonry walls, demolitions of doors, frames, ceilings, floor coverings and screeds, widening of door openings, production of openings and recesses, demolition of equipment bases in technical centers in the basement.
BGF EG: 1.060 m²
Extension of the wagon shed (lying sick right of way) on the ground floor:
In reinforced concrete construction,2 pcs well foundations, strip foundations,
Base slab, walls and ceiling with attic upstand in reinforced concrete.
Floor area extension carriage shed: approx. 40m²
Demolitions masonry walls approx. 100m³, demolitions suspended ceilings: approx. 200m², demolitions screeds: approx. 380m², demolitions doors with frames: 45 pieces,
Extension of wagon shed: 2 shaft ring foundations in concrete: 14m³, strip foundations reinforced concrete: 15m³, floor slab: walls and ceilings in reinforced concrete 26m³, structural steel 6.5 t.