SIDELEC is carrying out this consultation, the purpose of which is a framework agreement with purchase orders pursuant to Article R2162-2 2nd paragraph of the Public Procurement Code, for the execution of rural electrification works of extension, reinforcement or burial, above ground and underground, including according to the lots, the construction or modification of transformer substation. The services are divided into 3 categories of work: -A: reinforcements with job creation (R1) and reinforcements with station transfer (R2) -B: cable reinforcements or initial creations (R3) and extensions (Ext), without creation or transfer of workstation -C: burials (Enf). Companies are informed that, in addition, Sidélec Réunion is free to have rural electrification works carried out outside this market, in compliance with the rules set by the market and the public procurement code.
lot 1 or A-1: ER works of category A in the communes of Saint-Denis - sainte-Marie - sainte-Suzanne - la Possession - le Portrural electrification works of reinforcement with creation of post (R1) and reinforcement with transfer of post (R2)
lot 10 or C-2 Category C er work in the commune of Les Avirons - Cilaos - entre-Deux - etang-Salé - petite-Ile - saint-Joseph - saint-Leu - saint-Louis - saint-Philippe - saint-Pierrerural electrification works for the burial of networks (ENF)
lot 2 or A-2: ER works of category A in the communes of Saint-Paul - trois-Bassins - saint-Leu - les Avirons - etang-Salérural electrification works of reinforcement with creation of post (R1) and reinforcement with transfer of post (R2)
lot 3 or A-3: ER works of category A in the communes of Cilaos - entre-Deux - saint-Pierre- saint-Louis - petite-Ile - saint-Joseph - saint-Philipperural electrification works of reinforcement with creation of post (R1) and reinforcement with transfer of post (R2)
lot 4 or A-4: ER works of category A in the communes of Sainte-Rose - la Plaine-Des-Palmistes - saint-Benoit - saint-André - bras-Panon - salazierural electrification works of reinforcement with creation of post (R1) and reinforcement with transfer of post (R2)
lot 5 or B-1: ER works of category B in the communes of Saint-Denis - sainte-Marie - sainte-Suzanne - la Possession - le Portrural electrification, cable reinforcement or initial creation (R3) and extension of existing networks (Ext), without creation or transfer of transformer substations
lot 6 or B-2: ER works of category B in the communes of Saint-Paul - trois-Bassins - saint-Leu - les Avirons - etang-Salérural electrification, cable reinforcement or initial creation (R3) and extension of existing networks (Ext), without creation or transfer of transformer substations
lot 7 or B-3: ER works of category B in the communes of Cilaos - entre-Deux - saint-Pierre- saint-Louis - petite-Ile - saint-Joseph - saint-Philipperural electrification, cable reinforcement or initial creation (R3) and extension of existing networks (Ext), without creation or transfer of transformer substations
lot 8 or B-4: ER works of category B in the communes of Sainte-Rose - la Plaine-Des-Palmistes - saint-Benoit - saint-André - bras-Panon - salazierural electrification, cable reinforcement or initial creation (R3) and extension of existing networks (Ext), without creation or transfer of transformer substations
lot 9 or C-1: Category C er work in the communes of Bras-Panon-Possession-Plaine des Palmistes-St-André-St-Benoît-St-Denis-St-Paul-Ste-Marie-Ste-Rose-Ste-Suzanne-Salazie-Trois-Bassinsrural electrification works for the burial of networks (ENF)