Conversion and extension of the Marienschule Oythe - Lot 1: Structural work Lot 2: Plastering work
shellapprox. 500 tons of mixed soil, approx. 500 m3 before. Removing and installing filling sand,
supply approx. 700 m3 of filling sand, dismantle approx. 490 m2 of floor structure,
approx. 1260 m2 plaster removal, 100 m3 foundations, approx. 730 m2 base slab, approx. 2350 m2 floor ceiling
approx. 100 m2 prestressed concrete ceiling, approx. 860 m2 Verbled masonry, approx. 2960 m2 KS masonry,
approx. 345 m ground pipes, approx. 2320 m2 scaffolding
Plasterapprox. 6500 m2 plastering work