FL 32 heater new
Lot 32 - Heating technology
-Heat generation: connect to service station with 4 heating circuit connections
-Heat generation: Sub-central gym new with 3 heating circuit connections, buffer tank and hot water station
-5 mixed heating circuits with electr. controlled high-efficiency pump for HVAC heating coils
-approx. 800 m steel pipeline black DN 10-50
-approx. 190 m heating cables copper pressed DN 15-50
-Insulation mineral wool
-approx. 180m² underfloor heating studded plate
-3 heating circuit manifolds with dynamic flow control
-approx. 390m² swinging underfloor heating with Tichelmann distributor
-Dismantling and reinstallation of approx. 140 tube radiators, thermostatic valves with dyn. Flow control
-approx. 45 new tube radiators installation
For more contract deadlines, see procurement documents
Maintenance contract 4 years: The maintenance is taken into account for a term of 4 years without applying a present value factor in the quotation evaluation. A non-submitted maintenance price leads to the exclusion of the offer.
+++ The following documents must be submitted at the separate request of the contracting authority: - breakdown of unit prices according to Form 223; -Product information of named makes; - Initial calculation Content of the original costing: This must be drawn up at least in accordance with the content of Form 223 - Breakdown of unit prices of ALL headings, i.e.: LV item; Abbreviation; Quantity; Unit of quantity; time approach; partial costs including additions in euros per unit of measure (wages, materials, equipment, other); offered unit price (sum of wages, fabrics, equipment, other). +++