HVAC systems.
Dates for performing main performance on the construction site: Start of performance 23.10.2021; End of performance 24.11.2021
— disassembly prev. clt.- and ventilation ducts,
— 1 pc compact refrigeration unit 93 kW incl. piping,
— 1 pc supply and exhaust air unit 2 900 m
— 1 pc roof fan 1 350 m
— approx. 20 ventilation outlets,
- Thermal insulation for the aforementioned pipelines.