BA 2.6 - LSW an MTV Ost
The Murr Valley Viaduct East (BW 7022 693) is the second bridge structure to be built as part of the B14. On this structure runs the directional carriageway Schwäbisch Hall. It comprises two lanes and one hard shoulder
as well as edge strips on each side.
The subject of this tender is the construction of the noise barrier (7022 694) at the eastern Murr Viaduct, along the B14 Winnenden - Backnang, in the Backnang district. The noise barrier starts about 85m before the bridge, runs over the bridge and integrates into a noise barrier after the bridge.
Among other things, to provide the following planning and main construction services:
• Preparation of the approval and implementation planning for the noise barrier
• construction site equipment
• Construction of the bored pile foundations for the LSW posts in front of and behind the bridge structure
• Installation of the LSW posts
• Installation of the concrete base elements and infills with aluminium and acrylic glass elements
• Filling the terrain in front of the LSW
• Production of the berm behind the LSW
• Construction of the embankment stairs behind the LSW at the integration into the earthen embankment