For the probstei community school in Schönberg, the new construction of a three-field sports hall was approved, which after completion replaces a demolished existing hall. On a bend-bordered meadow area adjacent to the school grounds, the new hall building with a floor area of approx. 2,700
m
The new sports hall will consist of a three-field sports hall, in which mainly movement games, running and ball sports will take place, as well as a gym and a fitness room for stationary equipment on the 1st floor. While the technical ancillary rooms and changing rooms on the ground floor
are on the 1st floor visiting toilets. further adjoining rooms and the entrances to the spectator area of the gym, as well as the spectator stands of the Dreifeldhalle with approx. 470 seats and additional wheelchair areas arranged. A staircase opens up the 1st floor and the ventilation centre as a staggered floor on the 2nd floor.
Services Building Automation MSR:
New installation of the building automation with 3 control cabinets for the control of the heating / ventilation systems with approx. 800 data points.