approx. 770 m² of glazing work as profiled glazing on the sports hall and ventilation centre
- total 770 m2 of profiled glazing
- total 3.5 m3 glulam, l = approx. 95 m
- total approx. 410 kg various wall brackets 38 pieces
- total approx. 1,630 kg longitudinal beam l = approx. 37 m
- total approx. 3,530 kg cross beam 38 pieces
- total approx. 435 kg Bolt carrier 18 pieces
- total approx. 390 m2 thermal insulation d = 16 cm
- a total of 1 piece external steel door + block frame