Modifications of the existing school building, which is part of the Luksian Toivonkatu campus, with construction and building engineering works.
A restructuring site where space changes are implemented to reflect six (6) school programs. Project size c. 5,500 brm
The project is the form of implementation of the project, with its construction and construction engineering works. Status changes are being made to the original section, completed in 1937, as well as expansion sections made in 1950 and 1972.
Spatial changes will be made to the premises of Harju School:
— The gym is being converted into a lecture hall and a studio space for the media industry
— Auxiliary facilities in the gym will be converted into teaching rooms
— The uses of teaching facilities are being converted into special teaching facilities and workspaces
— Groupwork space elements are added to the corridors
— Kitchen facilities will be removed and converted into teaching spaces
— A small IV engine room is made in the attic space — As external work, the construction of a loading dock and the construction of a new door to the outside wall in the loading space and the closure of the external wall windows in the loading area.