The city of Kassel is planning the construction of a new cactus house and wintering house at the existing location (marked as building G3 on the attached site plan) in the Botanical Garden. The new building serves to preserve and expand the existing cactus collection and as a show greenhouse. The two greenhouses (cactus house and wintering house) are to be planned in a design unit. The wintering house is also used for events (e.g. weddings) in summer.
As part of the "Growth and Sustainable Renewal" funding programme, the city of Kassel is planning the
Replacement construction of a cactus house and wintering house at the existing location (as
Building G3 marked on the attached map) in the Botanical Garden.
Subject of the building planning are, among others:
- Incorporation into the results of the preliminary design phase architecture as a basis for further
Planning (annexes " Summary of LPH 2 results", "Präsentation_210816" and
"Cost estimates"), the planning, tendering and construction supervision of the
Greenhouses (performance profile buildings and interiors in work phases 3 to 9
according to § 34 HOAI, structural design in the work phases 1 to 6 according to § 51 HOAI and
Technical building equipment in the work phases 1 to 9 according to § 55 HOAI, if necessary further
planning services such as fire protection),
- the overall coordination of the specialist planners and construction participants involved in the project as
Generalplanerleistung.
- the observance of the procedures necessary for the preservation of the plants. The dismantling of the
existing greenhouses must be coordinated by the planner in the course of the new building.
- Necessary coordination processes must be taken into account here. In addition, the
volunteer "cactus friends" and, among other things, the monument protection in the
Integrate the planning process. Planning meetings with all those involved in planning and
During this time, builder's representatives usually serve as a video conference for 7 days, if required.
also on site.
- During LPH 8, weekly construction meetings must be held on site.
- In the planning, implementation and documentation, specifications of the state of Hesse as
(see also the guideline of the State of Hesse on
Promoting sustainable urban development). Due to the amount of funding, the implementation
a technical examination (annex list-construction-examination-to be submitted-data), as well as the submission of a proof of use (attachment list-baufachlichepruefung-verwendungsnachweis-data). For the different steps of the
Examination procedures, the dossier must be prepared and compiled accordingly.
- The recognized rules of technology as well as current literature and recommendations are available at
of service processing.
- Due to the complexity of the task, a step-by-step assignment is planned.