Electricity, heating, solar and nuclear energy | Tenderlake

Electricity, heating, solar and nuclear energy

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
24 September 2021
Closing Date:
26 October 2021
Location(s):
PL POLSKA (PL Poland/POLSKA)
PL41 Wielkopolskie (PL Poland/POLSKA)
Description:
Kępińska Buying Group. Supply of electricity in the period from 01.01.2022r. to 31.12.2022r.

2. The subject of the order is the supply of electricity between 01.01.2022r. and 31.12.2022r. to 1,762 points of consumption (PPE) with a total estimated volume (+/- 10%)

16,478,56 MWh (basic order with option), from this:1) For premises and facilities — tariff groups C, G, R (Part 1 of the order) — 8,045,69 MWh — detailed list of PPE is Annex 1a to SWZ 2) To premises and facilities — tariff group B (Part 2 of the order) — 2,542,01 MWh — detailed list az PPE Annex 1b to SWZ3) For road lighting purposes (Part 3 of the order) — 5 898,24 MWh (basic order with option) — a detailed list of PPE is Annex 1c SWZ

3. The Ordering Party provides for the right of option. The right of option will be covered by the supply of electricity for the Community of Rzepin (part 3 of the contract), under which the Contracting Party reserves the possibility of excluding 47 PPE with a total volume of 599,29 MWh from the contract.

Supply of electricity to premises and facilities

III.1. Detailed description of the object of the order - Part 1 of the order - Supply of electricity to premises and facilities — tariff groups C, G, R

1. Number of measurement systems accounting for consumed electricity 694 pcs

2. A detailed description of the pre-emptive points (PPE) of the Contracting Party included in Annex No 1a to the SWZ.

3. Estimated electricity consumption over the term of the contract 8,038,31 MWh, of which:

Zone I 4,763.72 MWh

Zone II 2,221.19 MWh

Zone III 1,053.40 MWh

The above data is indicative. The Contractor should take into account possible fluctuations in electricity consumption at a level of +/ -10%).

4. Deliveries will take place between 01.01.2022 and 31.12.2022, provided that the details of delivery times (commencement and termination) for individual collection points are described in Annex 1a to SWZ column “Delivery period”.

5. The current electricity supply contracts will expire or terminate with effect on the day prior to the planned commencement date (“Supply Period” column). The obligation to terminate contracts is on the side of the contracting (recipients).

Electricity supply to premises and facilities — tariff group B

. Detailed description of the item of the order - Part 2 of the order - Supply of electricity to premises and facilities - tariff group B

1. Number of measurement systems accounting for consumed electricity 9 pcs

2. A detailed description of the pre-emptive points (PPE) of the Contracting Party included in Annex No 1b to the SWZ.

3. Estimated electricity consumption over the term of the contract of 2,542.01 MWh, of which:

Zone I 1,006.09 MWh

Zone II 650.59 MWh

Zone III 885.33 MWh

The above data is indicative. The Contractor should take into account possible fluctuations in electricity consumption at a level of +/ -10%).

4. Deliveries will take place between 01.01.2022 and 31.12.2022, provided that the details of delivery dates (commencement and termination) for individual collection points are described in Annex No 1b to SWZ column “Delivery period”.

5. Measuring systems are tailored to the seller's change procedure.

6. The current electricity supply contracts will expire or terminate with effect on the day prior to the scheduled start date (“Supply Period” column). The obligation to terminate contracts is on the side of the contracting (recipients).

Supply of electricity for the needs of road lighting

Detailed description of the item of the order - Part 3 of the order — Electricity supply for road lighting

1. Number of measurement systems accounting for electricity consumed 1 059 pcs

2. A detailed description of the pre-emptive points (PPE) of the Contracting Party is included in Annex No 1c to the SWZ.

3. Estimated electricity consumption in the (basic order) term of the contract 5 298,95 MWh, of which:

Zone I 3,288.20 MWh

Zone II 2,010.75 MWh

Order including the option:

Estimated electricity consumption over the term of the contract 5,898.24 MWh

(including options), of this:

Zone I 3,581.32 MWh

Zone II 2 316.92 MWh

The above data is indicative. The Contractor should take into account possible fluctuations in electricity consumption at a level of +/ -10%).

4. Deliveries will take place between 01.01.2022 and 31.12.2022, provided that the details of delivery dates (commencement and termination) for individual collection points are described in Annex No 1c to SWZ column “Delivery period

Download full details as .pdf
The Buyer:
Powiat Kępiński, Starostwo Powiatowe w Kępnie
CPV Code(s):
09300000 - Electricity, heating, solar and nuclear energy