The construction project includes the construction of a new MRT and CT extension, which will be built directly adjacent to the existing building component B on the ground floor.
The building services installations in the area ground floor to 3rd floor have not yet been renovated and must be adapted to the current requirements in terms of fire protection and hygiene.
The building is the eastern half of a 4-storey old building. The western half of the building was already renovated in the period up to 2011.
approx. 20 pcs fire dampers DN 100-DN 315
approx. 17 pcs volume flow controller DN 125-DN 200
approx. 20 pcs poppet valves 100 mm-160 mm
approx. 114 m² air ducts up to 1,500 mm
approx. 154 m² air ducts as fittings up to 1,500 mm
ca. 370 lfm Wickelfalzrohr DN 100-DN 315
approx. 244 m² insulation for air ducts and fittings
1 pc heat pump 25,0 kW
2 pcs precision climate chambers cooling capacity 13.0 kW or 6.0 kW
6 pcs cold water recirculating air cooler cooling capacity 1,893 W or 2,627 W
4 pcs cold water wall-mounted units Cooling capacity 2,115 W or 4,275 W
approx. 520 running meters welded threaded tube 1/2" to 3"
approx. 70 running meters refrigerant line copper pipe 10 mm-16 mm
4 pcs centrifugal circulation pumps Volume flow 13.7 m³/h or 18.08 m³/h
approx. 520 running meters insulation cold water pipe