Civil engineering work for:
- Demolition work on asphalt and paved surfaces
- Terrain profiling and installation RC for construction site equipment
- Soil removal to create the working level for pile foundations and reinforced concrete beam installation
- Laying of underground pipes for sewage and rainwater
- Earthworks for high-voltage electrical installations
- Soil installation after foundation work as a basis for base plate
- Dismantling of earth material under base plate and restoration of original terrain profile of the "Spreeniederung"
- Dismantling of RC surfaces of the BE as a basis for outdoor facility design
A single-storey, barrier-free, U-shaped new building with dimensions of approx. 83 x 53 m opposite the Fontane primary school is planned. The structure is formed by three wings of the building, which enclose a spacious courtyard. This serves as a play and movement zone.
The foundation for the entire building is carried out with 189 displacement piles (foundation separate power lot).
The civil engineering work must therefore be carried out in individual, structurally coordinated sections, in particular in the foundation process.