Bridge construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 July 2023
Closing Date:
31 August 2023
Location(s):
BE22 Prov. Limburg (BE) (BE Belgium/BELGIQUE-BELGIË)
Description:
N75 Ecoduct Dilserbos in Dilsen-Stokkem

The assignment concerns an 'Engineering & Build'. It is noted that study work has already been carried out, so that the 'Engineering' component rather relates to optimizing the already delivered study work that is made available with the underlying specification bundle.

A reference design of the Dilserbos ecoduct was drawn up. The design of the ecoduct, together with the bicycle bridge and the cycle paths, was included in one global environmental permit file. This authorisation is subject to conditions. The assignment includes further drawing up the design of the ecoduct, taking into account the licensed file. The design also includes the calculation of the stability of the entire structure.

The contractor appoints a safety coordinator design and draws up the VGP Design. For the execution, the contractor also appoints a safety coordinator implementation.

An independent inspection agency is appointed by the contractor to monitor the study and the execution of the works.

The contractor is responsible for the execution of the entire design.

The contract mainly comprises:

the study work (engineering) of the subject of this assignment

Ecoduct stability study and accessories

safety coordination design and implementation

the appointment of an independent audit office for the follow-up of the study and its implementation

felling of trees, grubbing up shrubs;

taking less nuisance measures during the execution of the works (over/along/in regional road N75)

making a foundation for the ecoduct making an abutment and middle pillar for the ecoduct

Building the ecoduct

the groundwork for the construction of the integration of the ecoduct into the landscape

the construction of drainage and buffering for rainwater, the local relocation of conflicting sewerage (gravitational drainage)

the study with regard to the vision screen, including the placement of the vision screen on the ecoduct

planting material and seeding works on the ecoduct and in the roadsides

the study and placement of lighting at the bottom of the ecoduct, incorporated into the finishing of the embankments of the abutments

the maintenance of the works during the guarantee period

The assignment concerns an 'Engineering & Build'. It is noted that study work has already been carried out, so that the 'Engineering' component rather relates to optimizing the already delivered study work that is made available with the underlying specification bundle.

A reference design of the Dilserbos ecoduct was drawn up. The design of the ecoduct, together with the bicycle bridge and the cycle paths, was included in one global environmental permit file. This authorisation is subject to conditions. The assignment includes further drawing up the design of the ecoduct, taking into account the licensed file. The design also includes the calculation of the stability of the entire structure.

The contractor appoints a safety coordinator design and draws up the VGP Design. For the execution, the contractor also appoints a safety coordinator implementation.

An independent inspection agency is appointed by the contractor to monitor the study and the execution of the works.

The contractor is responsible for the execution of the entire design.

The contract mainly comprises:

the study work (engineering) of the subject of this assignment

Ecoduct stability study and accessories

safety coordination design and implementation

the appointment of an independent audit office for the follow-up of the study and its implementation

felling of trees, grubbing up shrubs;

taking less nuisance measures during the execution of the works (over/along/in regional road N75)

making a foundation for the ecoduct making an abutment and middle pillar for the ecoduct

Building the ecoduct

the groundwork for the construction of the integration of the ecoduct into the landscape

the construction of drainage and buffering for rainwater, the local relocation of conflicting sewerage (gravitational drainage)

the study with regard to the vision screen, including the placement of the vision screen on the ecoduct

planting material and seeding works on the ecoduct and in the roadsides

the study and placement of lighting at the bottom of the ecoduct, incorporated into the finishing of the embankments of the abutments

the maintenance of the works during the guarantee period

Download full details as .pdf
The Buyer:
Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling Limburg
CPV Code(s):
45111250 - Ground investigation work
45112200 - Soil-stripping work
45112500 - Earthmoving work
45221110 - Bridge construction work
45232440 - Construction work for sewage pipes
45233162 - Cycle path construction work
45233229 - Verge maintenance work
45262210 - Foundation work
45262212 - Trench sheeting work
71000000 - Architectural, construction, engineering and inspection services
71220000 - Architectural design services
71241000 - Feasibility study, advisory service, analysis
71242000 - Project and design preparation, estimation of costs
71247000 - Supervision of building work
71322000 - Engineering design services for the construction of civil engineering works
71325000 - Foundation-design services
77211400 - Tree-cutting services
77211500 - Tree-maintenance services
77310000 - Planting and maintenance services of green areas