Construction of new sections of the heating network with connections and heating nodes in order to eliminate existing local heat sources fired with solid fuel – stage I (stage 10)
Construction of new sections of the heating network with connections and heating nodes in order to eliminate existing local heat sources fired with solid fuel – stage I (stage 10). Episodes 1 to 7. The subject of the contract is specified in detail in the Design (Technical) Documentation and STWIORB.