Renovation of the outdoor swimming pool in Esslingen-Berkheim:
The NRF is about 1 870 m
The following measures are to be implemented in the course of the upcoming refurbishment:
- total renovation of the inner and outer pools (stainless steel lining),
- Renovation of the foyer, changing room and sanitary area,
- complete renewal of the technical building installations (heating, ventilation, sanitary, electric and bathing water technology),
- barrier-free access,
- energetic upgrading of the building envelope.
The work is expected to start in September 2019 - May 2021.
- Low-voltage main distribution - approx. 4 control cabinets,
- sub-distributions - approx. 4 stand distributors,
- cable trays - approx. 400 m,
- cables / lines - approx. 25,000 m,
- Lights: - approx. 200 St.
- SiBe system - 1 central battery system, approx. 105 emergency / emergency lights,
- 1 fire alarm system with approx. 92 smoke detectors,
- 1 sound system with approx. 50 loudspeakers,
- 2 data cabinets,
- 1 SHE center,
- 1 video surveillance system.