Relocation of the bus stop Hainichener Straße, Mittweida
Quantities and masses for tender documents for BA1 Lot 50_1 Relocation of bus stop Hainichener Straße
1pcs Construction of traffic safety
1pcs Construction of a replacement stop
1psch erection of detour signage
48m Tear down, store, rebuild fence
Break up 159 m² bituminous fastening
Cutting 98 m of asphalt
Break up 155 m³ of unbound fastenings
268 m Break off curbs and gutters
75 m² of small pavement, breaking up granite
Demolition of 265 m² concrete pavement, temporary storage
1pcs Waiting shelter dismantling, temporary storage, re-erect
1pcs Dismantling, temporarily storing, re-erecting the stop stele
Clearing 45 m² shrubs
1pc tree felling
Clearing 85 m² of plant ground cover and topsoil
Loosen 77 m³ of soil, load it
Making 550 m² of flat surface
130 m² foundation floor improve with fabrics to be supplied
70 m of soil trench Disconnect, backfill, load cable
Deliver and lay 156 m of different shelves
Produce 219 m² asphalt surface, different designs
225 m² of concrete pavement, temporarily restored
Restoring 7 m² of paving from natural stone
100 m trough channel / boron channel to make natural stone
Making 90 m³ of antifreeze coatings
Create 10 m drainage channel D400, DN 100
150 m² of geogrids, laying
Supply and lay 150 m² of geotextile
Supplying and laying 158 m of different curbs
69pcs Supplying and installing concrete palisades
Re-establish road markings
325 pcs Supply and plant shrubs
Rebuild 19 m² lawn
1 year of completion maintenance
2 years of developmental care
Disposal of all substances that are no longer needed