Procurement of a track triangle, a simple track connection and a simple turnout in grooved rail design with sidings on concrete sleepers.
Turnouts Stuttgarter Straße:
Single-track branch and 2 switches
Grooved rails, sidings and intermediate tracks
Switch systems Karlsruher Straße and main station south side:
Simple track connection as well as a simple
Switches, sidings and intermediate tracks.
At the heart of all switches and crossings
Block material and thick-web rails, concrete sleepers,
including ground box for electrics
Umstellvorrichtung, mechanische
Changeover devices with earth box.
Scope of delivery as outlined in green in the two enclosed plans
depicted. Free delivery construction site ununloaded.