Machinery for the production and use of mechanical power | Tenderlake

Machinery for the production and use of mechanical power

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 October 2023
Closing Date:
17 November 2023
Location(s):
DEA23 Köln, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
High-temperature heat pump for the provision of district heating with a capacity of 150 MWth using river water (Rhine)

RheinEnergie AG intends to construct a large-scale heat pump system in a capacity class of approx. 150 MW thermally for the generation of district heating on the premises of the Cologne-Niehl site. The heat source of the large-scale heat pump will be river water taken from the Rhine. There is a requirement to provide a district heating flow temperature of over 100 °C for the district heating network with the large-scale heat pump from the lowest Rhine water temperature of approx. 5 °C as a heat source.

_

The construction project is divided into several lots.

This announcement covers Lot 1 with the scope of supply "Large heat pump" and Lot 2 with the scope of supply "River water abstraction".

_

Lot 1:

The large-scale heat pump system consists of the main mechanical components: heat exchanger, refrigerant circuit system including compressor and refrigerant accumulator. Also included are the EI&C components required for the operation of the large-scale heat pump, including the associated software and controls, as well as the structural planning and scope of delivery.

_

Lot 2:

River water abstraction includes both the construction services and the plant technology for river water abstraction from the harbour basin in the order of approx. 24,000 – 30,000 m³/h, divided into two to three intake lines. Also included are the EI&C components required for the operation of the river water intake with the associated software and controls

Großwärmepumpe

The scope of this announcement is the procurement of the large-scale heat pump system as a thermal generation unit for the provision of district heating as well as the entire construction services for the planning and construction of one or more buildings, including grounding, lightning protection and technical building equipment.

_

The large-scale heat pump system consists of the main mechanical components: heat exchanger, refrigerant circuit system including compressor and refrigerant accumulator, as well as district heating circulation pumps. Also included are the EI&C components required for the operation of the large-scale heat pump, along with the associated software and controls.

_

As a functional system, the large-scale heat pump system is to be planned, delivered, installed and commissioned in detail by the applicant. The applicant shall place the equipment in its scope of supply on the market in compliance with CE conformity.

A multi-year maintenance contract is to be offered

Flusswasserentnahme

Lot 2:

The scope of this announcement is the procurement of river water abstraction for the supply of the large-scale heat pump with the heat source river water.

_

The river water abstraction includes both the construction services and the plant technology for river water abstraction from the harbour basin in the order of approx. 24,000 -30,000 m³/h, divided into two to three intake lines.

_

As a functional system, river water abstraction is to be planned, delivered, installed and put into operation in detail by the applicant. The applicant shall place the equipment in its scope of supply on the market in compliance with CE conformity.

Download full details as .pdf
The Buyer:
RheinEnergie AG -L-
CPV Code(s):
42100000 - Machinery for the production and use of mechanical power