Project planning of buildings and interiors according to §34 HOAI, LPH 1-9 and special services, gradual commissioning.
The city of Lauenburg / Elbe is planning to convert and expand the vineyard school to adapt the building complex to increasing numbers of pupils and to restructure it for a modern educational teaching concept.
The planning area includes the existing school complex Weingarten 10 to 12 (parcel 5/45) plus the plot of land Weingarten 14 to 16 (parcel 5/19) in 21481 Lauenburg / Elbe, which is located on the street and connects to the northwest and is currently built on with an apartment building. The plots have a total area of approximately 8,500 m2. The construction site for the planned extension is defined in more detail by development plan no.106 and is located in the northwest of the planning area, ie on parcel 5/19 and in the area of "component B". The construction work takes place during operation. An alternative location will be created for a limited number of classrooms.
The building complex of the primary school, which has been expanded several times, consists of 5 building parts / wings A to F (see attachment, site plan and information document "Description of measures".) Only wings A and B are converted and an extension is built.
A feel for the development of modern architectural elements in interaction with the existing historical and modern building structure is necessary for the design of the new, contemporary school building and can be demonstrated on the basis of experience. A wall relief in the interior of the school is a listed building. The monumental and historically significant residential development in the surrounding area must be considered in terms of urban planning.
The requirements for a modern school building are laid down in service phases 1-3 in a master plan for the entire building complex. The creation of the master plan is part of the planning task.
The further development of the spatial program takes place in close coordination with the school authorities and school management with a view to the appropriate handling of the educational content and goals. The topics of new media and digitization are given special consideration when planning the interiors.
The sustainable renovation, renovation and expansion of the school building is intended to contribute to climate protection and CO2 neutrality. One focus is on energy aspects, such as reducing the electricity and heat consumption of the school property. Due to the high number of visitors, the school has a representative function and a pioneering role.
The existing building has a gross floor area of approx. 4,500 m
For this purpose, planning offices are invited to participate in the competition, which cover the building project planning and have implemented similar measures in the past.
The service phases 1-9 should be processed in the service profile according to § 34 HOAI. The assignment will take place in stages.
The following procedure is carried out:
In phase 1, potential applicants are invited to participate and submit the application with the required evidence.
In phase 2, the requests to participate will be checked and the number of admitted applicants will be limited.
Phase 2 applicants will be invited to negotiate separately.
The costs of the KG 200-700 were with a volume of max. Estimated gross EUR 13 300 000. According to the preliminary cost estimate, the costs for the KG 300 are approx. EUR 7,000,000 and for the KG 400 approx. EUR 2,160,000 gross. The above-mentioned gross construction cost limit of EUR 13.3 million is to be understood as a value on which the design must be based in all project stages and which must be checked for its feasibility in the preliminary design.
Procedure-related award documents are available on the e-award platform for the procedure at http://www.e-vergabe-sh.de/vergabekonto/bekanntmachungen/.