Part 1. Purchase, delivery and installation of water and sewerage management systems (GIS, SCADA, telemetry system)
The range of parts includes:
Task 1 — purchase, delivery and implementation of an IT system for record keeping and managing the water and sewer network, as well as the implementation of the GIS system, and the purchase of a server
Task 2- purchase, delivery and installation of telemetry devices, i.e.: telemetry posts with the necessary equipment and its configuration and purchase and implementation of the SCADA system. Number of measuring points on the water pipe in the Bielina agglomeration: DN 160- 8 points; DN110-5 points.
Part 2. Purchase and factory delivery of a new portable power generator set with chassis in a cased and closed version for outdoor operation, to supply induction systems operating on inverters.
Diesel unit 50kW/63kVA
Part 1. Purchase, delivery and installation of water and sewerage management systems (GIS, SCADA, telemetry system)The range of parts includes:
Task 1 — purchase, delivery and implementation of an IT system for record keeping and managing the water and sewer network, as well as the implementation of the GIS system, and the purchase of a server
Task 2- purchase, delivery and installation of telemetry devices, i.e.: telemetry posts with the necessary equipment and its configuration and purchase and implementation of the SCADA system. Number of measuring points on the water pipe in the Bielina agglomeration: DN 160- 8 points; DN110-5 points.
• Detailed scope of the order and the requirements for equipment and information systems is provided in Annex 9 to the SWZ Detailed description of the subject of the contract. During the duration of the contract, the Contracting Authority allows a change in the size of the contract, the scope of which does not exceed the powers of the Ordering Authority under the Public Procurement Law
• The amount of the offer should include training for all employees indicated by the Ordering Party or the User of water and sewerage networks. Training should be done in the field of operation and configuration of implemented IT systems. The training must take place prior to the signing of the final acceptance protocol on the installed devices and at the premises of the Ordering Party. Before performing the training, the Contractor shall register in the IT system all telemetry devices of the water supply network in the area of Bielina agglomeration and describe them in accordance with the Ordering Authority's guidelines.
• All installation and installation work carried out in the vicinity of the existing site armament (teletechnical cables, sewer lines, water supply) should be carried out manually with extreme caution and under the supervision of a network user employee.
Purchase and supply of new mobile power generator set with chassis in enclosed version for outdoor operation for power supply of induction systems operating on invertersDiesel unit 50kW/63kVA Rated power 50kW/63 kVA Frequency 50Hz Voltage 230V/400V Class of performance (acc. to PN-ISO8528) - min. G2 Control and Signaling Panel- Manual/Automatic Main and Emergency Switch Power take-off strip
Starter battery
Battery Buffer Charger
SZR system
Rotation speed controller - electronic
Hour Counter
Fuel tank in assembly frame
Production date of the unit- 2022
Aggregate manufactured in Poland/ European Union
Generator:
Generator type- Synchronous brushless
Degree of protection- IP 23
Voltage stability +/- 5%
Voltage adjustment - electronic AVR
Insulation class H
Engine:
Engine type- Diesel - DIESEL
Engine Block Heating
Engine power- 4 cylinder free aspirated
Stabilization of turnover- +/- 2%
Cooling:
Cooling Type- Liquid
Lubrication- Pressure Oil
Oil Sensor - Yes
Ignition:
Boot- Electric
Fuel:
Fuel type- ON-DIESEL
Working time on full tank - Min. 10 h
Construction:
Structure- Built-up
Hot Dip Galvanized Steel Chiller Frame
Housing made of hot dip galvanized steel sheet, whole painted in multilayer, reactive primer and polyurethane topcoat
The housing of the unit is to ensure protection of all its elements from the effects of weather conditions
Atmospheric enclosure silenced in the driving system
Doors on the inside of the unit secured with perforated galvanized sheet
Silencing of the unit made of non-combustible mineral wool with a high degree of damping or other material that meets the requirements of this type of equipment
Meets the requirements of Directive 2000/14/EC for outdoor equipment
Other equipment:
Power take-off socket adapter 1x125A/400V, 1x63A/400V, 2x32A/400V, 3x16A/230V
Flexible cable with increased insulating strength in n/in embodiment:
• cable section of 20 meters long and 5x16 mm2 cross section terminated from the side of the unit with a receiving plug, on the other end with a socket,
• cable section 20 meters long and section 5x10 mm2 terminated from the side of the aggregate with a receiving plug, on the other end with a socket,
• cable section 20 meters long and 5x4 mm2 cross section terminated from the side of the unit with a receiving plug, on the other end with a socket.
Approval chassis
Suspension-2-axis
Wheels - 2 pcs with steel rims and tires and 1 spare wheel, 1 pcs. support wheel and 4 pcs stabilizing supports
Lighting- Exterior Traffic Compliant
As part of the contract, the contractor will also provide
a) At your expense, the transport of the object of the order to the Ordering Authority (Partyzantów 17, 26-004 Bieliny Street
b) The purchased and delivered aggregate should have all documents necessary for normal operation and for registration in the District Department of Communications and Transport
c) The warranty card in Polish and the user manual in Polish must be provided together with the aggregate.