Plumbing.
New construction of a residential and commercial building with 29 apartments, 4 shops and a new retirement home with 60 resident rooms. Both buildings have a basement and are connected by an underground car park.
The common drinking water supply is located in the house. The common underground car park connects to the substation in the retirement home.
- approx .: 400 pieces of furnishings;
- approx .: 1,800 m sewer pipes DN 50-DN 150;
- approx .: 5 500 m water pipes DN 15-DN 50;
- approx .: 100 pieces of bathroom fan;
- approx .: 4 KWL systems;
- approx. 20 air circulation cooling units;
- approx .: 5 pieces of multi split outdoor units.