Lot 06 Drywall works
Number of LV pages approx. 130 / execution period 17.11. - 05.09.2024
Lot 06 Drywall works
- Approx. 20 m2 dismantling and storage of existing suspended ceiling
- Approx. 26 door openings in existing drywall cavity walls enlarge, moved, closed
- Approx. 200 m2 Additional slab layer on existing drywall cavity walls incl. Q3 F30 + F90
- Approx. 180 m2 facing shell in front of existing drywall cavity walls incl. door openings and Q3
- Approx. 825 m2 New partition walls D 125 - 250 mm, single and double studs,
incl. door openings and Q3
- Approx. 100 m2 New partition walls fire protection requirement REI 90
- Approx. 50 m2 New partition walls with OSB cladding
- Approx. 40 pcs. make door openings in new partitions
- Make approx. 40 m of wall tapers on new and existing lightweight partitions
- Approx. 170 m2 Create new installation walls
- Approx. 1900 m2 acoustic suspended ceilings, with surface-finished perforated panel
- Approx. 660 m2 suspended ceiling, smooth
- Approx. 90 m2 cantilevered acoustic ceiling F30
- Approx. 70 m2 cantilevered suspended ceiling, smooth (in pieces)
- Approx. 530 m2 facing shells (in m2 and pieces) without and with fire protection requirement REI30
- Approx. 12 cases 2- and 3-sided
- Approx. 280 m of reveal cladding as dry plaster (+ mechanical fastening)
- Approx. 50 m2 F90 cladding steel girders as a new lintel in reinforced concrete wall
- Approx. 10 m2 F90 fire protection duct for exhaust pipes
- Approx. 4 m2 fire protection upgrade of cross-laminated timber ceiling REI 30 from below
(Aufleistung)
- Approx. 45 m2 ceiling apron / ceiling bulkhead (approx. 50 m at different heights)
- Approx. 20 m2 wide-span suspended ceiling, OSB cladding