Roofing work incl. roof greening
Construction of the roof waterproofing, carpentry and plumbing work as well as green roofs for the replacement of the existing primary and secondary school with the following services:
— FPO foil warm roof with green roof as a slope-free retention roof, approx. 3,860 m2
— 2-layer bitumen waterproofing roof, approx. 110 m2
— Roof hatches, 2 pieces
— Flat roof window, 8 pieces
— Linear fall protection, approx. 620 running metres
— Flat roof leak detection system
— Sawn timber (softwood), approx. 2 m3 (beam approx. 100 running metres)
—Dachschalung, ca. 70 m2
— Attic covers (coated aluminium), approx. 600 running metres
—Storage (aluminium coated), approx. 620 running metres
—Roof drainage downpipes (stainless steel), approx. 120 running metres
—Double standing seam cover (weathered copper), approx. 70 m2
—Double standing seam cover (aluminium coated), approx. 5 m2