EDVS and curtain ventilated façade cladding.
Dates for performing the main performance on the construction site: start of performance 7.11.2021; end of performance 17.12.2021
— ca. 220 m2 facade scaffolding,
— approx. 540 m 3 room scaffolding for façade work,
— approx. 350 m 2 thermal insulation composite system, mineral wool,
— 66m 2 drained ventilated façade cladding, stainless steel aluminum UK and plaster backing plate.