The turnkey realization of a 4-speed secondary school including a school sports hall as a two-field hall is planned.
The construction project also includes the associated outdoor facilities as well as the furnishing / equipment of the school and sports hall.
In advance, an existing building was demolished (school prefabricated building) and a construction site clearing with Flächenentsiegelung and area leveling carried out.
Interior doors and internal glazing as aluminum construction:
- 36 pieces of interior window F30, approx. 0.56 x 3.00 m,
- 2 pieces of internal glazing F60, approx. 3.20 x 2 m 80 m,
- 10 pieces interior doors, 1-wing, with smoke and fire protection requirements,
- 14 interior doors, 2-wing, with smoke and fire protection requirements.