The market has a firm tranche and 2 optional tranches.
- firm tranche: phase 1: assistance with the award of the global performance market,
- optional slice 1: phase 2: assistance during the design phase of the sorting center,
- optional tranche 2: phase 3: monitoring of the realization of the sorting center.
The market has a firm tranche and two optional tranches.
Firm phase: phase 1: assistance to the global performance market
- mission 1: drafting of the functional and detailed performance technical program (PTFPD),
- mission 2: drafting of the other parts of the DCE of the MGP contract,
- mission 3: assistance with the award of the global performance contract;
Optional step 1: phase 2: assistance during the design phase of the sorting center
- mission 4: assistance during the design phase of the MGP (ESQ to Pro),
- mission 5: assistance during the administrative phase,
- mission 6: assistance with the verification of implementation and synthesis studies;
Optional tranche 2: phase 3: monitoring of the realization of the sorting center
- mission 7: assistance to the follow-up of the works,
- mission 8: assistance to empty test operations, assistance with the follow-up of the industrial commissioning (MSI) and the reception operations of the structure,
- mission 9: assistance during the period of the guarantee of perfect completion.