Control and surveillance during the execution of the false tunnel work in Pie de Bascos (HI-500), T. M. de Frontera, island of El Hierro.
Control and surveillance during the execution of the false tunnel work in Pie de Bascos (HI-500), T. M. de Frontera, island of El Hierro.