MSR/GLT
Building automation field devices, control cabinets, BA cable laying, programming,
Commissioning, documentation, operator station, maintenance for 4 years
· 124 pcs. Delivery and installation of sensors,
· 15 pcs delivery and installation of actuators,
· 2 pcs. Creation and delivery 2 ASPs (GA control cabinets)
- ASP 01 Heating and HVAC 192 physical data points, 143 bus connection
- ASP 02 RLT 295 Datenpunkte physikalisch, 2 Zähleraufschaltung
· approx. 8,400 m telecommunications line up to J-H-(St)-H 6x2x0.8
· approx. 2,100 m installation cable up to NHXMH-J 5x2.5
· approx. 1,400 m control cable Ölflex Classic 400P 7Gx1,5
· approx. 500 m data cable 4x2xAWG22
· approx. 310 m electrical conduit ALU up to M 32