The overall construction project is the construction of a new primary school extension as
Two-storey solitary building, Ludgerus Primary School - part of the former Klaraschule Kurfürstenstraße
160b in 46399 Bocholt. The building, which does not have a basement, will be constructed using conventional solid construction methods in the
Ground floor and built in solid wood construction on the upper floor.
Tendered service: Drywall work
The main subject of the entrepreneurial service offered here:
All ceilings in the interior and the roof overhangs in the outdoor area are installed as suspended ceilings
postulated. In addition, drywall walls, as well as pre-walls and acoustically effective flexible facing shells
needed.