Steel construction work as part of the expansion and conversion of the Ravensberger Gymnasium
Elevated support gratings made of different profiles for the ventilation units and ventilation ducts on the roofs of a two- and a three-storey building section are to be supplied and installed (total weight approx. 30 t).
The maintenance aisles required for maintenance purposes must be manufactured with press gratings (total length approx. 230 m, widths between 600 and 1,000 mm). 9 pieces of crossings / stairs.
In the existing class wing, interception structures (IPE270), total weight approx. 10 t, are to be installed in the classrooms.
Steel construction work as part of the expansion and conversion of the Ravensberger Gymnasium
Elevated support gratings made of different profiles for the ventilation units and ventilation ducts on the roofs of a two- and a three-storey building section are to be supplied and installed (total weight approx. 30 t).
The maintenance aisles required for maintenance purposes must be manufactured with press gratings (total length approx. 230 m, widths between 600 and 1,000 mm). 9 pieces of crossings / stairs.
In the existing class wing, interception structures (IPE270), total weight approx. 10 t, are to be installed in the classrooms.