Replacement of air conditioning installation in the Jupiter 2 building at the Guiana Space Centre
The purpose of this consultation is to replace two CTANs in the Jupiter building at the Guiana Space Centre:
- With regulation and buses in accordance with SDO/IN standards of the BMS business and interfacing with ST²
- CTA freewheeling, T1 TB1
- Occupancy/vacancy management
- CO2 detection / presence detection
The installation will make it possible to communicate with ST² by a local business BMS.
The installation will reduce energy consumption and achieve energy and cold metering.