The current positive urban development in the Bremen district of Woltmershausen results in an increased space requirement at the Roter Sand secondary school.
The Roter Sand school is a four-class high school for grades 5 to 10 with around 600 students and a school staff of around 70 employees. The city decided that the high school should now be increased to 5 classes. For this purpose, a new vintage house is to be built southwest of the existing building. A space requirement of approx. 2,600 m will be required for the new building
In addition, the Roter Sand secondary school is to become a S&E location. This means that within the scope of inclusion, schoolchildren with limitations in perception and development should also be trained at the location. This also requires adjustments to the existing structure. The remodeling share is approx. 10% of the total project.
A complete renovation of the existing building has already taken place in recent years.
The total construction costs (KG 100 - KG 700) amount to approx. EUR 10.6 million gross according to a preliminary cost assumption.
The subject of this tender are the architectural services (building project planning).
- Project planning building phases 1 and 2, optional phases 3 to 9 according to § 34 HOAI i. V. m. Appendix 10, Section 10.1.
Special / additional services:
- Cost estimate in accordance with DIN 276-1: 2018-12 with the establishment of quantity structures and specification of the unit prices (special service for LPH 2);
- optional: cost calculation according to DIN 276-1: 2018-12 with setting up quantity structures and specifying the unit prices (special service for LPH 3);
- optional: in-depth price check (special service for LPH 7);
- optional: keep a construction diary according to RLBau (special service for LPH 8);
- optional: tracking of the removal of defects as evidence on request (special service for LPH 9).