Design and manufacture of a 1.5 MW/1000 S water load for the WEST ECRH system.
The purpose of the delivery is to provide a 1.5 MW/1000 S water charge for the ECRH system for WEST for the ECRH system. It is broken down into firm and optional benefits.
Firm benefits are broken down as follows:
— RF load design studies,
— manufacture of RF load and its accessories,
— factory recipe (FAT),
— packing and delivery of the water charge,
— two-year warranty,
— constructor folder.