EGPA 8435 concerning the assignment of the supply of «metal structural work» divided into 5 lots.
EGPA 8435 - Lot 1: «Supports and brackets» with presentation obligation for the material code FS 106/453 of CELE certification or other certifying body within 6 months from the date of signing the contract while for the remaining material codes the obligation to presentation of the CSAL certification (possession of the EN15085 certification) within 6 months from the date of signing the contract. CIG: 8193716458.
EGPA8435 - Lot 2 «Levers, adapters and tanks» with presentation obligation for material codes FS 278/304 and 965/880, CELE certification or other certification body within 6 months from the date of signing the contract while for material codes FS 252 / 002, 254/948, 278/685 and 897/423 the obligation to present the CSAL certification (Possession of the EN15085 certification) within 6 months from the date of signing the contract. CIG 8193740825.
EGPA 8435 - Lot 3 «Connection assembly with tie rod between swinging beam and supporting beam» with presentation obligation for cat. FS 973/895 of CELE certification or other certification body within 6 months from the date of signing the contract. CIG 81937185FE.
EGPA 8435 - Lot 4 "Spark arresters, vents, fittings, rings, bushes and rocker arms" with presentation obligation for material codes FS 262/132, 262/621, 262/884, 278/040, and 278/318 of CELE certification or other certification body within 6 months from the date of signing the contract, while for material codes FS 216/234, 240/478, 240/479, 244/154, 244/155, 278 / 687,622 / 848 and 924/920 the obligation to present the CSAL certification (possession of the EN15085 certification) within 6 months from the date of signing the contract. CIG: 8193727D69.
EGPA 8435 - Lot 5 «Tie rods, bands, discs and plates» with obligation to present for the material codes of the CSAL certification lot (Possession of the EN15085 certification) within 6 months from the date of signing the contract. CIG: 8193728E3C.