Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
04 June 2020
Closing Date:
13 July 2020
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
Renovation of the passage through Münsingen

Refurbishment and expansion of the existing streets divided into 3 sub-projects.

- Renewal of foundation layer, edging and coverings.

- Renewal of the existing plant pipelines (street drainage, water, sewerage, electrical systems and LSA).

Main amounts:

TP1:

- Demolition of the pavement 1,800 m 2nd ;

- Mill the base 3 500 m 2nd ;

- Earthwork excavation 4,600 m 3rd ;

- Ditch excavation 1 700 m 3rd ;

- Sprouts 2,400 m 2nd ;

- cable protection pipes 1 700 m;

- Pipe coverings / fillings 1 700 m 3rd ;

- Foundation layers 3,600 m 3rd ;

- edging 2 400 m;

- linings 3 800 t.

TP3:

- Demolition of 7,000 m 2nd ;

- Excavation for foundation layer 3,600 m 3rd ;

- Trench excavation 1 200 m 3rd ;

- Sprouts 5 400 m 2nd ;

- cable protection pipes 3 900 m;

- Pipe coverings / fillings 1,600 m 3rd ;

- Foundation layers 4,500 m 3rd ;

- edging 850 m;

- Coverings 2,000 t.

TP5:

- Demolition of the surface 8 400 m 2nd ;

- Earthworks excavation 2,500 m 3rd ;

- trench excavation 200 m 3rd ;

- cable protection tubes 720 m;

- Pipe coverings / fillings 300 m 3rd ;

- Foundation layers 500 m 3rd ;

- edging 900 m;

- pads 7 900 t.

Refurbishment and expansion of the existing streets divided into 3 sub-projects.

Renewal of foundation layer, edging and coverings.

Renewal of the existing plant pipes (street drainage, water, sewerage, electrical systems and LSA).

Main amounts:

TP1:

- Demolition of the pavement 1,800 m 2nd ;

- Mill the base 3 500 m 2nd ;

- Earthwork excavation 4,600 m 3rd ;

- Ditch excavation 1 700 m 3rd ;

- Sprouts 2,400 m 2nd ;

- cable protection pipes 1 700 m;

- Pipe coverings / fillings 1 700 m 3rd ;

- Foundation layers 3,600 m 3rd ;

- edging 2 400 m;

- linings 3 800 t.

TP3:

- Demolition of 7,000 m 2nd ;

- Excavation for foundation layer 3,600 m 3rd ;

- Trench excavation 1 200 m 3rd ;

- Sprouts 5 400 m 2nd ;

- cable protection pipes 3 900 m;

- Pipe coverings / fillings 1,600 m 3rd ;

- Foundation layers 4,500 m 3rd ;

- edging 850 m;

- Coverings 2,000 t.

TP5:

- Demolition of the surface 8 400 m 2nd ;

- Earthworks excavation 2,500 m 3rd ;

- trench excavation 200 m 3rd ;

- cable protection tubes 720 m;

- Pipe coverings / fillings 300 m 3rd ;

- Foundation layers 500 m 3rd ;

- edging 900 m;

- pads 7 900 t.

Download full details as .pdf
The Buyer:
Oberingenieurkreis II
CPV Code(s):
45000000 - Construction work