The new sports hall will be built on the area of the previous sports ground at the school between the school building and Waldschmidtstraße
built.
The building is predominantly a reinforced concrete structure with EIFS. The roof of the sports hall is hipped. The
Roof construction is designed as an explosive device with wooden trusses and steel tension struts. Buildings for
changing rooms, plumbing, technology, equipment and gallery with a green flat roof.
Exterior building dimensions: approx. 38 x 45 m
Building height: approx. 14 m
masses:
approx. 750m² laying separation and protective mat
approx. 560 m² laying drain mat
approx. 560 m² laying filter fleece / filter mats
approx. 260m eaves profile - produce aluminium angles
produce approx. 170 m² safety edge strips made of gravel (8 cm height)
approx. 560 m produce sedum shoot lake seeding and green roof strips
Execution period July - September 2023
Greening of flat roofs east and west August 2023