In a listed building complex in Berlin, the plastering work is to be carried out in the interior (walls and ceilings). Partly it is about new plastering of the components, partly about renovation / addition of the existing plaster surfaces, including preparatory work.
In a listed building complex in Berlin, the plastering work is to be carried out in the interior (walls and ceilings). Partly it is about new plastering of the components, partly about renovation / addition of the existing plaster surfaces, including preparatory work.
The main components are:
- Replaster walls, approx. 12,000 m2
- Replaster ceilings, approx. 600 m2
- Renovation of existing plaster walls, approx. 5,000 m2
- Renovation of existing plaster ceilings, approx. 1000 m2