House 38a, New Kitchen, Lot of Shell
Structural work for the new building of house 38a – extension of the main kitchen Execution of earthworks, reinforced concrete work, insulation and waterproofing work,
Inlay work for plumbing and electrical work.
- Underpinning in jet blasting approx. 45 m³
- Excavation pit, disposal approx. 3,100 m³
- Gründungspolster Mineralstoffgemisch ca. 1,000 m³
- Gründungspolster Schaumglasschotter ca. 700 m²
- Articulated subgrade, cleanliness layer basement approx. 185 m²
- Floor slab edge formwork, single-hip approx. 165 m
- Formwork walls and beams, approx. 1,750 m² on both sides
- Slab edge formwork, single-hip approx. 170 m
- Supply and install in-situ concrete, for floor slabs approx. 290 m³
- Supply and install in-situ concrete, normal requirements, walls approx. 225 m³
- Supply and install in-situ concrete, for ceilings approx. 40 m³
- Single and strip foundations, as semi-finished elements approx. 165 m³
- Brunnenringgründung ca. 130 m³
- Prefabricated slabs with reinforced concrete approx. 3,000 m²
- Doppelwandelements ca. 2.100 m²
- Reinforced concrete beams, as semi-prefabricated part approx. 45 m³
- Reinforcement, built-in parts approx. 245 t
- Precast columns 27 pcs
- Prefabricated staircase, 10-12 pcs, 12 pcs
- Prefabricated staircase, intermediate landings 8 pcs
- Interior walls non-load-bearing, prefabricated elements approx. 180 m²
- Kellerabdichtung ca. 85 m²
- Perimeterdämmung ca. 500 m²
- Underground pipeline construction, complete approx. 100 m
- Empty conduits as insertion work in shell components approx. 1,600 m
- Earthing system/lightning protection as insertion work in shell components approx. 1,600 m
- Verbundestrich