Building construction work | Tenderlake

Building construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
19 October 2018
Closing Date:
21 November 2018
Location(s):
DE933 Harburg (DE Germany/DEUTSCHLAND)
Description:

The district of Harburg has decided to expand the grammar school at the Kattenberge in Buchholz and the secondary school Hollenstedt within the framework of a PPP model.

In Buchholz, a total contractor is to have an extension of approx. 1 350 m 2 NUF plan and build inclusive bridge financing turnkey.

In Hollenstedt is an extension with about 1 100 m 2 NUF planned and built inclusive bridge financing turnkey.

The contractor shall provide all necessary planning and construction services for the ready-to-use construction of the new buildings and maintenance within the extended warranty period, including the adjustment of the technical installations, on the basis of functional construction performance specifications with space program. This includes the application for planning permission and the provision of temporary bridge financing. A transfer of land to the contractor is excluded.

Extension of the Gymnasium am Kattenberge in Buchholz

The district Harburg intends, the Gymnasium at the Kattenberge in Buchholz in the course of the conversion from G8 (Abitur after 12 years) to G9 (Abitur after 13 years) to an extension with a usable area of about 1 350 m 2 to expand.

In addition, minor alterations are in existence with an area of approximately 400 m 2 intended.

A total of 5 AUR's, 2 NTW rooms with collection, 2 PC rooms, the teacher's room with tea kitchen and copy room as well as toilets, ar-chiv / technology and corridors are to be provided for the cultivation. The district has drafted a preliminary draft to test its feasibility.

The client expects a comprehensive overall offer for planning, construction and interim financing services as well as maintenance services within the extended warranty.

Extension of the secondary school Hollenstedt

The district Harburg intends, the high school Hollenstedt to a cultivation with a utilization area of approx. 1 100 m 2 to expand. In addition, about 400 m 2 Conversions in stock planned.

In total, 12 AUR's, 4 group rooms, 1 parent's room, 1 teacher's room, 1 office for social workers as well as ancillary and technical areas in the new building are to be considered for the cultivation.

The client expects a comprehensive overall offer for planning, construction and interim financing services as well as maintenance services within the extended warranty.

Download full details as .pdf
The Buyer:
Landkreis Harburg
CPV Code(s):
45210000 - Building construction work
45214200 - Construction work for school buildings
66000000 - Financial and insurance services
71240000 - Architectural, engineering and planning services
71320000 - Engineering design services