The works are divided into three lots. They are part of the roll-out of the Hasselt master plan and concern railway works, signaling works and catenary works.
- lot 1: railway works: demolition, construction of tracks and railway equipment,
- lot 2: signaling works: demolition and construction of cable ducts, cabling, power supply chain, railway signals and signaling installations,
- lot 3: catenary works: demolition and construction of catenary constructions.
57/52/2/20/005 - L35-L21A Hasselt Station. Renewal of railway infrastructure: railway worksSee specifications.
57/52/2/20/005 - L35-L21A Hasselt Station. Renewal of railway infrastructure: signaling worksSee specifications.
57/52/2/20/005 - L35-L21A Hasselt Station. Renewal of railway infrastructure: overhead line worksSee specifications.