Overhaul and refurbishment work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 September 2022
Closing Date:
18 October 2022
Location(s):
PL432 Zielonogórski (PL Poland/POLSKA)
Description:
Implementation of Contract V as part of the Project: "Ordering rainwater management in the Zielona Góra Agglomeration – stage I"

The subject of this contract is the implementation of Contract V, under which task No. 8 entitled: Renovation of rainwater sewer collectors in the city of Zielona Góra will be performed.

The task will be to:

reconstruction and renovation of selected sections of the gravitational rainwater sewerage network

in the city of Zielona Góra. As part of the investment task, it is planned to replace a section of the DN250 concrete channel along a slightly new route along Dzika Street and to replace a section of the DN600 concrete collector along the same route in Wazów Street.

The subject of this contract is the implementation of Contract V, under which task No. 8 entitled: Renovation of rainwater sewer collectors in the city of Zielona Góra will be performed.

The task will be to:

reconstruction and renovation of selected sections of the gravitational rainwater sewerage network

in the city of Zielona Góra. As part of the investment task, it is planned to replace a section of the DN250 concrete channel along a slightly new route along Dzika Street and to replace a section of the DN600 concrete collector along the same route in Wazów Street. The task provides for:

- Construction of the rain collector section ø600 approx. L=61 m

- Construction of a section of rain collector ø300 approx. L = 200 m

- Installation of street drains approx. 2 sets.

- Trenchless renovation of main channels from ø 250 to ø 800 approx. L=2523 m

- Renovation of the well approx. 70 kpl.

- Construction of new wells approx. 12 sets.

The renovation of the existing rainwater drainage system was designed using the sleeve method, made

made of polyester non-woven fabric with a felt structure, soaked in polyester resin, hardened on site (CIPP). However, for circular ducts with a diameter less than or equal to DN400, it is allowed to use sleeves made of glass fibers soaked in polyester resins, cured on site (CIPP) using UV light.

Download full details as .pdf
The Buyer:
"Zielonogórskie Wodociągi i Kanalizacja" Sp. z o.o.
CPV Code(s):
45453000 - Overhaul and refurbishment work