Construction of a real estate program of 80 dwellings,
Either,
40 LLS housing + 16 BRS housing, intended for the LOC,
24 housing units in free accession, intended for GREEN CITY REAL ESTATE
Big workBig work
It is specified that lots 02-12-13-18 presented here are the subject of a joint solicitation to apply COL/GREEN CITY.
Other work packages, which are the subject of a solicitation to be applied by each of the contracting authorities, are excluded from the order group.
InsulationInsulation
Tiling - FaienceTiling - Faience
PlumbingPlumbing
It is specified that lots 02-12-13-18 presented here are the subject of a joint solicitation to apply COL/GREEN CITY.
Other work packages, which are the subject of a solicitation to be applied by each of the contracting authorities, are excluded from the order group.
ELECTRICITY/HIGH CURRENTS - LOW CURRENTSELECTRICITY/HIGH CURRENTS - LOW CURRENTS
It is specified that lots 02-12-13-18 presented here are the subject of a joint solicitation to apply COL/GREEN CITY.
Other work packages, which are the subject of a solicitation to be applied by each of the contracting authorities, are excluded from the order group.
Soft floorsSoft floors
Paint - Wall Coverings - FinishesPaint - Wall Coverings - Finishes
LocksmithLocksmith
PortalPortal
It is specified that lots 02-12-13-18 presented here are the subject of a joint solicitation to apply COL/GREEN CITY.
Other work packages, which are the subject of a solicitation to be applied by each of the contracting authorities, are excluded from the order group.
ElevatorElevator
WATERPROOFINGWATERPROOFING
Frame / cover / zinguerieFrame / cover / zinguerie
Aluminum exterior joineryAluminum exterior joinery
PVC exterior joineryPVC exterior joinery
facade coatingsfacade coatings
Interior joineryInterior joinery
WOODEN TERRACES / EXTERIOR FLOOR COATINGWOODEN TERRACES / EXTERIOR FLOOR COATING
PLATRERIE/PARTITIONS/LININGS/CEILINGSPLATRERIE/PARTITIONS/LININGS/CEILINGS