In the sub-project school inventory there is a comprehensive renovation with conversion measures in the entire existing building. The school is brought up to a sustainable level in terms of room layout, room quality and technical expansion.
WaterproofingHauptmassen The 1 - Abdichtungsarbeiten
- Remove old waterproofing windows, incl. disposal
2.BA: 510m ca. 510m
- Substrate pre-treatment and pre-painting window connection
2.BA: 510m ca. 510m
- Application of airtight sealing foil inside of window connection
2.BA: 510m ca. 510m
InnenputzarbeitenHauptmassen The 2 - Innenputzarbeiten
- Leveling plaster d =10mm, walls, columns, parapet
2.BA: 420m2 ca. 420m2
- Ausgleichsputz d =40mm
- 2.BA: 100m2 ca. 100m2
- Interior insulation interior walls 80mm
- 2.BA: 470m2 ca. 470m2
- Interior insulation interior walls 50mm
- 2.BA: 100m2 ca. 100m2
- Interior insulation of interior walls, ceiling strips 30mm
- 2.BA: 150m2 ca. 150m2
- Reinforcement and finishing plaster
- 2.BA: 500m2 ca. 550m2
- Interior plaster gypsum plaster B1 - walls (reinforced concrete and masonry)
- 2.BA: 1,000m2 ca. 550m2
- Interior plaster gypsum plaster B1 - supports, beams incl. substrate pre-treatment
- 2.BA: 200m2 ca. 200m2
- Interior plaster lime cement plaster PII - Walls incl. substrate pre-treatment
- 2.BA: 75m2 ca. 75m2