Electrical engineering 2nd construction phase: lightning protection; Fire alarm system; electrical system; ELA;
VE 270 ELECTRICAL ENGINEER
Publication text
- 2 pcs sub-distributor for central battery system
- 7 St Unterverteiler
- 2 St Tableau Beleuchtungssteuerung
- approx. 13,000m of cables and wires
- ca. 150 St Installationsgeräte
- ca. 1.800m Kabeltragsysteme
- Device connections and potential equalization
- fire foreclosures
- approx. 500 lighting fixtures
- Line network telephone and data with 120 ports
- Extension of nurse call system
- ELA systems
- Extension watch system
- Extension of the fire alarm system
- cable network antenna
- video surveillance
- lightning protection